Double-head high-speed shoe mould engraving and milling machin
Your present position:Home > Products
- Double-head high-speed shoe mould engraving and milling machin
Tailor-made for wood modulus production
* The left and right feet are processed simultaneously.
* Double Z axis independently aligning knife, easy to change knife;
* The special fixture for shoe mould has high precision and convenient operation.
* Specially designed dust removal system, environmental protection, humanization;
* It can be equipped with starting pull-down device.
* Suitable for processing oversize shoe moulds for export
ITEM | Specifications | ||
Commodity/model | M5-5570 (For Woodern milling) | ||
Control | Bus control system | ||
Motor(X/Y/Z) | 750W Panasonic motor | ||
X/Y/Z axis travels | 350×2/500/350×2 mm | ||
Table size | 600×200mm | ||
Spindle speed/Taper hole | 24000rpm/ER20 | ||
Spindle drive motor | 3.0KW×2 (constant-power spindle) | ||
Spindle cooling system | Oil colling | ||
Positioning accuracy | 0.01mm/300mm | ||
Repeatability accuracy | 0.005mm | ||
Rapid rate(X/Y/Z) | 20m/min | ||
Feed rate(X/Y/Z) | 15m/min | ||
Ballscrew diameter & screw pitch | 25mm & 5mm(HIWINC) | ||
Linear guideway | Hiwin Linear guideway | ||
Bearing | NSK P4 Ball Screw Bearing | ||
Machine Weight | 2600kg | ||
Machine Size | 1800mm×1800mm×2200mm |
* Two types of temperature control, fixed temperature control and differential temperature control, users can choose freely.The spindle cooling oil cooler protects the safe operation of the machine.
* The use of internationally renowned brand compressors ensures strong, fast, efficient and energy-saving refrigeration.
* The oil pipeline is equipped with precision filters and flow switches.
* High and low pressure, overload, oil level, phase and other multiple protection to ensure the safe operation of the unit
Samples of shoe moulds:
TOP 10-5 minutes
TOP2R -- 11 minutes
OUT2R - 4 minutes
IN2R - 4 minutes
HEEL2R -- 1.5 minutes
TOE2R -- 1 minute
TOP1R - 2 hours 39 minutes
OUT1R - 59 minutes
IN1R - 57 minutes
HEEL1R - 18 minutes
TOE1R -- 15 minutes
Clear corners - 5 minutes
Sharing: 5 hours 40 minutes
TOP 10-4 minutes
TOP2R - 10 minutes
TOP1R - 1 hour 41 minutes
Clear corners - 5 minutes
Sharing: 2 hours
TOP 10-3 minutes
TOP6R -- 2 minutes
OUT6R -- 1.5 minutes
IN6R - 1.5 minutes
HEEL6R -- 30 seconds
TOE6R--30 seconds
TOP1R - 1 hour 44 minutes
IN1R - 35 minutes
HEEL1R -- 9 minutes
TOE1R - 6 minutes
Clear corners - 10 minutes
Sharing: 3 hours and 18 minutes
TOP 10-3 minutes
TOP6R -- 2 minutes
OUT6R -- 1.5 minutes
IN6R - 1.5 minutes
HEEK6R -- 30 seconds
TOE6R--30 seconds
TOP1R - 1 hour 44 minutes
IN1R - 35 minutes
HEEL1R -- 9 minutes
TOE1R - 6 minutes
Clear corners - 10 minutes
Sharing: 2 hours and 18 minutes